| |
 |
| CONCRETE
SYMPTOM |
Fastener
does not hold
in base material or base material spalls
 |
|
CAUSE
|
| | |
High strength concrete |
| | |
Hard or large aggregate in concrete |
| |
ACTION
|
| | |
Use shorter fastener |
| | |
Use PowerPoint pin |
| | |
Use load with a different power
level |
|
| |
Fastener
penetrates
too deep
|
|
CAUSE
|
| | |
Fastener too short for application |
| | |
Tool power level too high |
| |
ACTION
|
| | |
Use longer fastener |
| | |
Use a lighter powder load |
| |
|
|
|
| |
Fastener
does not
penetrate deep enough
 |
|
CAUSE
|
| | |
Fastener too long |
| | |
Tool power level too low |
| |
ACTION
|
| | |
Use shorter fastener |
| | |
Use a stronger powder load |
| |
|
|
| |
Fastener
bends
 |
|
CAUSE
|
| | |
Fastener hit large aggregate on entry |
| | |
Concrete too hard |
| | |
Fastener hit rebar just under
the surface |
| |
ACTION
|
| | |
Use shorter fastener |
| | |
Use PowerPoint pin |
| | |
Make sure tool is perpendicular to
the work surface |
| | |
Move over 3 inches, try to fasten
again |
|
|
|
| STEEL
SYMPTOM |
Fastener
does not penetrate the surface
 |
|
CAUSE
|
| | |
Driving power too low |
| | |
Material may be too hard for forced
entry fastener |
| |
ACTION
|
| | |
Increase powder load level |
| | |
Use PowerPoint pin |
| |
|
|
| |
Fastener
does not hold
in base material
 |
|
CAUSE
|
| | |
Steel base material is too thin |
| |
ACTION
|
| | |
Use gas system tools with smaller
Shank pin or Tek pin |
| |
|
|
| |
Fastener
breaks or bends
 |
|
CAUSE
|
| | |
Driving power is too low |
| | |
Fastener is too long |
| | |
Material may be too hard for forced
entry fastener |
| |
ACTION
|
| | |
Increase powder load level |
| | |
Reduce fastener length |
|
| |
Fastener
does not
fully penetrate steel
 |
|
CAUSE
|
| | |
Driving power is too low |
| | |
Steel base material too thick |
| | |
Application limit may have been
reached |
| |
ACTION
|
| | |
Increase powder load level |
| | |
Use PowerPoint pin |
|
Back
to Ramset Fastening Systems
|